Construction of new lab
Progress of the constuction of the new labs at Carmabi
Expected end date: summer 2012 when there will be new facilities for visiting scientists including new lab space and housing for ~30 people
January 2012: The finishing of the inside is starting....
December 2011: View from the highest point
December 2011: View from the southern side...
November 2011: Reaching the highest point... the Ministers of Environmental affairs and Education visit the construction side....
November 2011: Reaching the highest point... the Ministers of Environmental affairs and Education visit the construction side....
November 2011: Reaching the highest point... the Ministers of Environmental affairs and Education visit the construction side....
November 2011: Beginning of the walls on the fourth floor...
October 2011: View from the accomodations on the Southside of the buidling...
October 2011: View from the accomodations on the North side of the buidling...
October 2011: The 4th floor in which several romms will be built for students and visting researchers....
October 2011: The building now starts arise above everything else in the area...
October 2011: The future front of the building is still packed together....
October 2011: Pooring of the floor for the 4th floor....
October 2011: The beginning of the floor for the 4th floor which will provide long-term for visiting scientists....
September 2011: The beginning of the 3rd floor which will provide accomodations for groups up to 25 students....
September 2011: The old and new building...
September 2011: The new building is rising above the old one....
September 2011: The new building is starting to rise above the old one....
September 2011: Start of the construction of the floor or ceiling of the 3rd or 2nd level respectively
August 2011: The floor for the new lab facilities is done....
August 2011: The bottom floor of the second layer is being constructed....
August 2011: Floor 1....
August 2011: Et voila!
July 2011: Pouring the foundation...
July 2011: Preparations for pouring the foundation....
July 2011: Preparations for pouring the foundation....
June 2011: Preparing the foundation...
June 2011: work in progress....
June 2011: Making room for the new wine cellar.....
June 2011: Some lime stone needs "chipping" in order to make room for the new rooms.....
June 2011: With all the "stuff" out of the way, construction can begin.....
June 2011: The outline of the new building is being marked....
June 2011: The existing dorms.... totally destroyed.....
June 2011: The existing dorms... partially destroyed.....
June 2011: The new situation....
June 2011: New road is done, the old one is being removed.
June 2011: The new road in progress...
June 2011: The road needs to be moved in order to make space for the cranes required to built the new lab.